| Photo description : |
| The ongoing work on
the queue continues. |
|
| Date and Time : |
| 2003:12:12 03:52:28 |
| Shutter speed and
aperture : |
| 1/256 sec @ F2.8 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| Looking from the front
the new flume drop is in place |
|
| Date and Time : |
| 2003:12:12 03:53:16 |
| Shutter speed and
aperture : |
| 1/128 sec @ F4 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| A side profile of the
drop and the north tower. |
|
| Date and Time : |
| 2003:12:12 03:58:33 |
| Shutter speed and
aperture : |
| 1/128 sec @ F4.5 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| An overview of the
site from behind. |
|
| Date and Time : |
| 2003:12:12 03:59:32 |
| Shutter speed and
aperture : |
| 1/256 sec @ F3.2 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| Close up of the North
and Main towers, painting on the main tower continus |
|
| Date and Time : |
| 2003:12:12 03:59:52 |
| Shutter speed and
aperture : |
| 1/128 sec @ F3.2 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| Detail of the track
entering the block and of the Main tower. |
|
| Date and Time : |
| 2003:12:12 04:10:03 |
| Shutter speed and
aperture : |
| 1/256 sec @ F4.9 |
| Original width x
height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|