Home | Message Board | Construction Index

Dec 13, 2003 Journey to Atlantis Construction Photo Gallery

Page : [ 1 ] - 2 - 3 - Next

Photo description :
The ongoing work on the queue continues.

Date and Time :
2003:12:12 03:52:28
Shutter speed and aperture :
1/256 sec @ F2.8
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative
Photo description :
Looking from the front the new flume drop is in place

Date and Time :
2003:12:12 03:53:16
Shutter speed and aperture :
1/128 sec @ F4
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative
Photo description :
A side profile of the drop and the north tower.

Date and Time :
2003:12:12 03:58:33
Shutter speed and aperture :
1/128 sec @ F4.5
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative
Photo description :
An overview of the site from behind.

Date and Time :
2003:12:12 03:59:32
Shutter speed and aperture :
1/256 sec @ F3.2
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative
Photo description :
Close up of the North and Main towers, painting on the main tower continus

Date and Time :
2003:12:12 03:59:52
Shutter speed and aperture :
1/128 sec @ F3.2
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative
Photo description :
Detail of the track entering the block and of the Main tower.

Date and Time :
2003:12:12 04:10:03
Shutter speed and aperture :
1/256 sec @ F4.9
Original width x height :
2272 pixels x 1704 pixels
Metering mode :
Evaluative

Page : [ 1 ] - 2 - 3 - Next

Made with Gallery Constructor 2


Site Meter