 |
| Photo description : |
| At the edge of the construction an new curb has been poured. |
|
| Date and Time : |
| 2004:02:27 17:34:10 |
| Shutter speed and aperture : |
| 1/128 sec @ F2.8 |
| Original width x height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| Posts, pipes and holes have apeared in this area of the construction |
|
| Date and Time : |
| 2004:02:27 17:35:08 |
| Shutter speed and aperture : |
| 1/256 sec @ F5.6 |
| Original width x height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| the back end of the loading / unloading area |
|
| Date and Time : |
| 2004:02:28 12:52:39 |
| Shutter speed and aperture : |
| 1/256 sec @ F6.3 |
| Original width x height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| On the backside of the tank is the loading station |
|
| Date and Time : |
| 2004:02:28 12:55:34 |
| Shutter speed and aperture : |
| 1/256 sec @ F8 |
| Original width x height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|
 |
| Photo description : |
| And a parting shot from the parkinglot. |
|
| Date and Time : |
| 2004:02:28 12:05:33 |
| Shutter speed and aperture : |
| 1/256 sec @ F7.1 |
| Original width x height : |
| 2272 pixels x 1704 pixels |
| Metering mode : |
| Evaluative |
|